1. Welcome to VegasMessageBoard
    It appears you are visiting our community as a guest.
    In order to view full-size images, participate in discussions, vote in polls, etc, you will need to Log in or Register.

Just checking

Discussion in 'Misc. Vegas Chat' started by mazoom, Jul 30, 2014.

Thread Status:
Not open for further replies.
  1. mazoom

    mazoom Low-Roller

    Joined:
    Aug 9, 2007
    Messages:
    214
    Location:
    Amsterdam, N.Y.
    Trips to Las Vegas:
    5
    Bally's construction

    Hi,
    just checking the status of Bally's Construction and the Grand Bazaar. Will be there in January 2015 and hope all the construction will be over.
    Anyone been there recently? How are things going?
    :thumbsup:
     
    Last edited: Jul 31, 2014
  2. Tahoejoe2

    Tahoejoe2 VIP Whale

    Joined:
    Dec 8, 2010
    Messages:
    1,475
    Location:
    ca
    Trips to Las Vegas:
    30
    I would re-title the thread if you want answers. Maybe, "Ballys Construction"?
     
  3. sybgal

    sybgal VIP Whale

    Joined:
    Apr 19, 2004
    Messages:
    6,270
    Location:
    Indiana
    Trips to Las Vegas:
    36
    I think they were projecting the end of this year BUT things always take longer ..... who knows. When we were there for MM it was a non-issue for us....no problem.
     
  4. mazoom

    mazoom Low-Roller

    Joined:
    Aug 9, 2007
    Messages:
    214
    Location:
    Amsterdam, N.Y.
    Trips to Las Vegas:
    5
    THANK YOU for the suggestion Tahoejoe2.
     
  5. owenmc60

    owenmc60 Low-Roller

    Joined:
    Mar 20, 2013
    Messages:
    169
    Location:
    Bristol, UK
    Trips to Las Vegas:
    1
    haha, did you acknowledge the suggestion, but not actually do anything about it? :poke:
     
  6. mazoom

    mazoom Low-Roller

    Joined:
    Aug 9, 2007
    Messages:
    214
    Location:
    Amsterdam, N.Y.
    Trips to Las Vegas:
    5
    I did change it to Bally's construction.
     
  7. UTE

    UTE Plastics

    Joined:
    Sep 27, 2011
    Messages:
    1,699
    Location:
    Salt Lake/Las Vegas
    Trips to Las Vegas:
    0
    I was in Bally's and Paris yesterday and took a look at the construction. The bones of the infrastructure are now in place and crews are closing in the buildings. It's got bigger buildings than I thought it would - it's not just little kiosks. Some of the buildings are two stories high. I think they're on schedule to meet their claimed Fall opening. It'll be late Fall, but Fall nonetheless.

    Bill
     
  8. Sam D

    Sam D Low-Roller

    Joined:
    Aug 27, 2011
    Messages:
    340
    Trips to Las Vegas:
    100
    I stayed at Bally's for 5 nights in July. I had a room on the 24th floor of the Indigo Tower which overlooked the pool. There was absolutely no construction noise or disruption in that part of the hotel.
     
Tags:
Thread Status:
Not open for further replies.